<?xml version="1.0" encoding="UTF-8" standalone="yes"?><?xml-stylesheet type="text/xsl" href="/oai-pmh-repository/static/oai2.xsl"?>
<OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd">
    <responseDate>2026-10-14T21:32:40Z</responseDate>
    <request verb="GetRecord" identifier="oai:data.mendeley.com/4fycv9td56.2" metadataPrefix="oai_dc">https://data.mendeley.com/oai</request>
    <GetRecord>
        <record>
            <header>
                <identifier>oai:data.mendeley.com/4fycv9td56.2</identifier>
                <datestamp>2018-07-15T12:10:43Z</datestamp>
            </header>
            <metadata><oai_dc:dc xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance">
    <dc:creator>Boveiri, Hamid Reza</dc:creator>
    <dc:title>125 random task-graphs for multiprocessor task scheduling</dc:title>
    <dc:publisher>Mendeley Data</dc:publisher>
    <dc:description>For a fair evaluation, a set of 125 random task-graphs for multiprocessor task scheduling are presented in this data-set. We have the following three major parameters to differentiate the shape and structure of these randomly generated task-graphs:

• Size (n): The first and most contributing parameter that is the number of nodes in the given task graph. We consider five different values as {32, 64, 128, 256, and 512}.

• Communication-to-Computation Ratio (CCR): Another important parameter which present us how much a graph is communication or computation intensive. All the nodes’ weights were randomly chosen from a uniform distribution with mean equal to 50 time-instance, and all the edges’ weights are randomly selected from a uniform distribution with mean equal to average-computation-cost * CCR. We consider five different values of CCR as {0.1, 0.5, 1.0, 5.0, and 10.0}, where selecting 0.1 makes the graph highly computation-intensive while 10.0 makes it highly communication-intensive.

• Parallelism: Third important parameter that is the average number of children for each task in the task-graph which contributes to the connectivity of the resulted task-graph. The higher parallelism, the higher connected graph. We considered five different values of parallelism as {3, 5, 10, 15, and 20}.
</dc:description>
    <dc:subject>Combinatorial Optimization</dc:subject>
    <dc:subject>Batch Scheduling Scheduling</dc:subject>
    <dc:type>Dataset</dc:type>
    <dc:identifier>doi:10.17632/4fycv9td56.2</dc:identifier>
    <dc:identifier>oai:data.mendeley.com/4fycv9td56.2</dc:identifier>
    <dc:rights>Creative Commons Attribution 4.0 International</dc:rights>
    <dc:rights>http://creativecommons.org/licenses/by/4.0</dc:rights>
    <dc:relation>https://data.mendeley.com/datasets/4fycv9td56</dc:relation>
    <dc:date>2018-07-15T12:10:43Z</dc:date>
</oai_dc:dc></metadata>
        </record>
    </GetRecord>
</OAI-PMH>
