<?xml version="1.0" encoding="UTF-8" standalone="yes"?><?xml-stylesheet type="text/xsl" href="/oai-pmh-repository/static/oai2.xsl"?>
<OAI-PMH xmlns="http://www.openarchives.org/OAI/2.0/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/ http://www.openarchives.org/OAI/2.0/OAI-PMH.xsd">
    <responseDate>2026-10-12T15:32:32Z</responseDate>
    <request verb="GetRecord" identifier="oai:data.mendeley.com/z9gfh66mj4.2" metadataPrefix="oai_dc">https://data.mendeley.com/oai</request>
    <GetRecord>
        <record>
            <header>
                <identifier>oai:data.mendeley.com/z9gfh66mj4.2</identifier>
                <datestamp>2023-12-12T18:59:12Z</datestamp>
            </header>
            <metadata><oai_dc:dc xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd" xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance">
    <dc:creator>Gehring, Marco</dc:creator>
    <dc:title>Instance dataset for resource-constrained project scheduling with diverging material flows</dc:title>
    <dc:publisher>Mendeley Data</dc:publisher>
    <dc:description>This dataset is motivated by the problem of scheduling a project with diverging material flows as presented in [1]. Diverging material flows are released during the execution of the project and are subject to limited processing and storage capacities. Typical examples are nuclear dismantling or other deconstruction/demolition projects, where large amounts of material must be classified, scanned for hazardousness, and processed accordingly. The problem setting is mathematically described as a resource-constrained project scheduling problem with cumulative resources (RCPSP/c). The RCPSP/c deals with finding a project schedule with minimal makespan that satisfies temporal, renewable resource, and cumulative resource constraints.

This dataset is described by the data article [2]. This data article provides details about the naming of the instances and solutions, the instance generation procedure, the heuristic methods used for computing the solutions, and the mathematical problem formulation. 

[1] M. Gehring, R. Volk, F. Schultmann, On the integration of diverging material flows into resource‐constrained project scheduling, Eur J Oper Res 303 (2022) 1071–1087. https://doi.org/10.1016/j.ejor.2022.03.047.
[2] M. Gehring, R. Volk, F. Schultmann, Instance dataset for resource-constrained project scheduling with diverging material flows, Data Brief 48 (2023), Article no: 109279. https://doi.org/10.1016/j.dib.2023.109279.</dc:description>
    <dc:subject>Operations Research</dc:subject>
    <dc:subject>Project Scheduling</dc:subject>
    <dc:subject>Benchmarking</dc:subject>
    <dc:contributor>Volk, Rebekka</dc:contributor>
    <dc:contributor>Schultmann, Frank</dc:contributor>
    <dc:type>Dataset</dc:type>
    <dc:identifier>doi:10.17632/z9gfh66mj4.2</dc:identifier>
    <dc:identifier>oai:data.mendeley.com/z9gfh66mj4.2</dc:identifier>
    <dc:rights>Creative Commons Attribution 4.0 International</dc:rights>
    <dc:rights>http://creativecommons.org/licenses/by/4.0</dc:rights>
    <dc:relation>https://data.mendeley.com/datasets/z9gfh66mj4</dc:relation>
    <dc:date>2023-12-12T18:59:12Z</dc:date>
</oai_dc:dc></metadata>
        </record>
    </GetRecord>
</OAI-PMH>
