WEIGHTED SCHEDULING OF IDENTICAL PARALLEL LOOMS WITH SEQUENCE-DEPENDENT SETUP TIMES: A LARGE-SCALE INDUSTRIAL APPLICATION OF SIMULATED ANNEALING
Published: 26 February 2026| Version 5 | DOI: 10.17632/35d6hhpczp.5
Contributors:
, , , Description
GAMS and MATLAB Data for Minimizing Makespan and Tardy Jobs in Parallel Machine Scheduling with Sequence-Dependent Setup Times Study
Files
Institutions
Categories
Heuristics, Parallel Machine Scheduling, Weaving