Smal and big instances for DAPFSP_SDST with heterogeneous factories
Published: 17 July 2017| Version 1 | DOI: 10.17632/6cpkw9v9gy.1
Contributors:
Daniela Ortíz Delgado, Description
This data contains the processing and setup times for 720 small instances and 270 big instances for the Distributed Assembly Permutation Flowshop Scheduling Problem with sequence dependent setup times and heterogeneous factories.
Files
Steps to reproduce
Open en Excel. Data has a structure readible from Gams.
Categories
Industrial Engineering, Optimization (Algorithms), Flowshop Scheduling