Smal and big instances for DAPFSP_SDST with heterogeneous factories

Published: 17 July 2017| Version 1 | DOI: 10.17632/6cpkw9v9gy.1
Contributors:
Daniela Ortíz Delgado,

Description

This data contains the processing and setup times for 720 small instances and 270 big instances for the Distributed Assembly Permutation Flowshop Scheduling Problem with sequence dependent setup times and heterogeneous factories.

Files

Steps to reproduce

Open en Excel. Data has a structure readible from Gams.

Categories

Industrial Engineering, Optimization (Algorithms), Flowshop Scheduling

Licence