Data for: Soil Simulant Preparation for Lunar Deep Drilling Exploration: Modeling and Validation

Published: 18-05-2019| Version 1 | DOI: 10.17632/b2yrdv27w3.1
Contributors:
Junyue Tang,
Shengyuan Jiang,
Yi Shen,
jieneng liang,
Ye Tian-

Description

These are the original data that monitored by the high speed camera during the tamping process. Under 18 consecutive tamp cycles, the motion parameters of the hammer are acquired, which can be used to verify the established model in this paper.

Files