A dataset of banana subsector in Hetauda-Dumkibas corridor

Published: 01-02-2021| Version 2 | DOI: 10.17632/c5m9csc7fk.2
Contributor:
Manoj Sharma

Description

This data was collected from 160 producers and 22 traders engaged in the banana subsector of the Hetauda-Dumkibas road corridor. The survey was conducted in 2019 AD.

Files