Parameter sensitivity analysis on stability of extra-large LNG tank roof under construction condition

Published: 8 January 2025| Version 1 | DOI: 10.17632/fchkfrmxv3.1
Contributor:
Tuanhai Chen

Description

(1) The real-time monitored data of the 270000 m3 LNG tank roof pouring stages: Including real-time stress variation data of the hoop beam and longitudinal beam during the dome pouring process of a 270000 cubic meter LNG storage tank. (2) Stability variation-different plate thicknesses: Data on the variation of buckling load factor with plate thickness (3) Stability variation-hoop beams section: Data on the variation of buckling load factor with hoop beams section amplification factor (4) Stability variation-longitudinal beams section: Data on the variation of buckling load factor with longitudinal beams section amplification factor (5) Stability variation-rise-to-span ratio: Data on the variation of buckling load factor with rise-to-span ratio amplification factor

Files

Institutions

China National Offshore Oil Corp

Categories

Real-Time Process Monitoring, Construction Process

Licence