Assessment of scale up and relocation of technical building services for battery cell production

Published: 8 August 2022| Version 1 | DOI: 10.17632/hxc4k97vmp.1
Contributors:
,
, Felipe Cerdas,

Description

This folder contains comprehensive static and temporal data about TBS's energy and power demand, particularly HVAC systems supplying dry rooms for battery production. Note that this folder only contains the data sets. Additional code and further documentation can be found in the corresponding Github repository. 22 locations around the world are considered and 10 size scales are available for each location. In addition, three variants of the internal loads (heat and moisture loads) were calculated for each size scale. Therefore, 30 simulation variants are available per location. This leads to a total of 660 simulation cases contained in the data sets. With the data set, scaling factors S in the range of 0.5 - 9 can be considered, which corresponds to volume flows of 5500 m3/h - 99000 m3/h.

Files

Institutions

Technische Universitat Carolo Wilhelmina Zu Braunschweig Institut fur Werkzeugmaschinen und Fertigungstechnik

Categories

Energy Engineering, Battery Material, Heating Ventilation Air Conditioning Control System, Database, Operating Room Management

Licence