Data (measured value) for: Risk Assessment and Management via Multi-source Information Fusion for Undersea Tunnel Construction

Published: 4 Jan 2020 | Version 1 | DOI: 10.17632/jwbkt4kmnz.1
Contributor(s):

Description of this data

Here is the 4M1E system data obtained at the site, which is used as the measured value to support the calculation results, in the Discussion section, line 591-615 of this paper. Data for 8 days from October to November 2018 were randomly selected, and the risk level was calculated according to these data. The results were consistent with the actual situation, so as to prove the validity and applicability of the undersea tunnel construction risk evaluation system.

Experiment data files

This data is associated with the following publication:

Risk assessment and management via multi-source information fusion for undersea tunnel construction

Published in: Automation in Construction

Latest version

  • Version 1

    2020-01-04

    Published: 2020-01-04

    DOI: 10.17632/jwbkt4kmnz.1

    Cite this dataset

    ZHOU, HONG; Cai, Hubo; Shen, Qiang; Yang, Liu; Zhao, Yinghui (2020), “Data (measured value) for: Risk Assessment and Management via Multi-source Information Fusion for Undersea Tunnel Construction”, Mendeley Data, v1 http://dx.doi.org/10.17632/jwbkt4kmnz.1

Statistics

Views: 99
Downloads: 2

Categories

Architectural Engineering, Mathematics-Number

Licence

CC BY NC 3.0 Learn more

The files associated with this dataset are licensed under a Attribution-NonCommercial 3.0 Unported licence.

What does this mean?
You are free to adapt, copy or redistribute the material, providing you attribute appropriately and do not use the material for commercial purposes.

Report