The settlement of high HSR embankment supported by the GRPS with geocell reinforcement

Published: 24 March 2025| Version 1 | DOI: 10.17632/k8xcwnzbfv.1
Contributor:
Pham Van Ngoc

Description

This dataset shows the simulation results of the settlement of high HSR embankment supported by the GRPS with geocell reinforcement system. The input variables include the distribution load, the DCM pile diameter, the soft soil thickness, the embankment height, and the number of geocell layers; while the settlement of the embankment after 100 years is the output.

Files

Institutions

  • Danang University of Science and Technology

Categories

Embankment

Licence