The questionnaire survey of traditional architecture preliminary design workflow
Published: 13 January 2022| Version 3 | DOI: 10.17632/pvh6ffm7sf.3
Contributors:
Keyao Wu, Shu TangDescription
A comparison of the time consumed by the traditional architecture preliminary design workflow and the BIM-based architecture preliminary design workflow is performed to determine the difference between the two. The time-consumption of the traditional design workflow is evaluated in the form of a questionnaire, based on feedback from industry practitioners and experts.
Files
Institutions
Xi'an Jiaotong-Liverpool University
Categories
Construction Management