The questionnaire survey of traditional architecture preliminary design workflow

Published: 13 January 2022| Version 3 | DOI: 10.17632/pvh6ffm7sf.3
Contributors:
Keyao Wu, Shu Tang

Description

A comparison of the time consumed by the traditional architecture preliminary design workflow and the BIM-based architecture preliminary design workflow is performed to determine the difference between the two. The time-consumption of the traditional design workflow is evaluated in the form of a questionnaire, based on feedback from industry practitioners and experts.

Files

Institutions

Xi'an Jiaotong-Liverpool University

Categories

Construction Management

Licence