Data for: Risk Assessment of Integrated Electrical, Natural Gas and District Heating Systems Considering Solar Thermal CHP Plants and Electric Boilers

Published: 15 June 2018| Version 1 | DOI: 10.17632/rs6gw95g9y.1
Contributors:
Juan Yu, Lin Guo, Ximing Song, Wenyuan Li, Mengnan Ma

Description

The file "Data_IEEE9_NGS6_DHS7" includes the connection figure and network parameters of case 1, and case 1 is composed of IEEE 9-node system, NGS 6-node system and 7-node district heating system. The file "Data_IEEE24_NGS20_DHS14" includes the connection figure and network parameters of case 2, and case 2 is composed of IEEE 24-node system, NGS 20-node system and 14-node district heating system.

Files

Categories

Integrated Energy System

Licence