This case study objective is to reduce changeover minutes in electrical accessories production line using SMED technique- A lean tool. SMED denotes principles, methodologies employed to minimize equipment setup durations. SMED aims to achieve setup times of under ten minutes, specifically a single-digit number of minutes. More internal setup and changeover time. Impacted stake holders in the organization due to the above challenges are Production, Logistics, Finance and Supply chain sectors.
Files
Steps to reproduce
This case study focuses on reduction of the changeover time in manufacturing line to satisfy client needs on time. This case study was applied on Electrical accessories product line but the same can be applied to all types of manufacturing and service industries too.