Inspection rate selection

Published: 28 August 2017| Version 1 | DOI: 10.17632/wxw4d4bc9w.1
Contributor:
Elcio Deccache

Description

This dataset was developed width simulation of a electric power distributor in a period of 130 months, 48 months revision, 5%a.a. inflation, 5%a.a. WACC. Agonia Força e Luz is a distributor for 100 consumers in a 10X10 grid.

Files

Categories

Electric Utility

Licence