Datainbrief-03.05.2022-all results

Published: 3 May 2022| Version 1 | DOI: 10.17632/zk9dg7gfk3.1
Contributor:
Aref al-Swaidani

Description

The excel sheets are results of experimental tests conducted by the author. Water permeability and chloride ion penetrability tests were conducted after 5 curing times; namely 2, 7, 28, 90 and 180 days. Concrete mixtures were prepared with six replacement levels of NNP; namely 0%, 1%, 2%, 3%, 4% and 5%, four water/binder ratios, namely 0.4, 0.5, 0.6 and 0.7. NP was ground to 2 different sizes; i.e. 100 & 500 nm.

Files

Institutions

Arab International University

Categories

Concrete Technology

Licence