Table S1: Cost disaggregation by building component for the case study store, based on the winning contractor’s bid
Published: 14 October 2022| Version 1 | DOI: 10.17632/238s947dgc.1
Contributors:
Jorge de Brito, Ana FerreiraDescription
Cost disaggregation by building component for the case study store, based on the winning contractor’s bid
Files
Institutions
- Universidade de Lisboa Instituto Superior Tecnico
Categories
Building Engineering