Figure 2. Multidimensional Substitution Assessment
Description
Figure 2. Multidimensional Substitution Assessment presents an original conceptual framework for examining whether substitute equipment, components, or industrial inputs restore a qualified, sustainable production capability under sanctions or related restrictions. Derived from Table 2 in §I.B of The Sanctions–Adaptation–Targeting Doctrine: Comparative Insulation, Targeting-Precedent Externality, and the Geopolitics of Civilian–Military Infrastructure Convergence (2026), the figure supports scholarly research reuse. The framework distinguishes six dimensions: procurement availability and provenance; functional adequacy and compatibility; integration and qualification time; sustainable throughput and quality; lifecycle and maintenance requirements; and external dependence and enforcement exposure. Each dimension connects a question with evidence and safeguards against unsupported inference. Verified delivery demonstrates access to an item; it does not establish integration, qualified output, reliability, or replenishment. The figure treats substitution as multidimensional. Rapid procurement may coexist with persistent quality losses, while near-equivalent equipment may require lengthy integration. Continued production may depend on inventories, additional resources, maintenance compromises, or new foreign suppliers. Circumvention and substitution therefore do not, by themselves, establish either sanctions failure or declining effectiveness. Applications should specify the capability, restriction, starting event, output and quality thresholds, sustainment period, assessment horizon, and evidence limitations. Industrial Time-to-Scale is a proposed temporal measure, not a validated composite index. Restriction-attributable delay requires a credible counterfactual and treatment of concurrent processes, bottlenecks, and alternative explanations. An unmet threshold during observation does not prove permanent denial. This is a conceptual research artifact, not an empirical dataset, causal estimate, country ranking, or determination of net policy success. Dimensions should remain separate unless aggregation rules and sensitivity tests are specified. Missing evidence must not be coded as absence. Supporting references appear in the manuscript, citations 21–24 and 26–27. They inform the component distinctions without independently validating the integrated framework. Authorship and responsibility rest with Nicolin Decker; no institutional endorsement is implied.
Files
Steps to reproduce
1. Define the artifact. Reproduce Figure 2 as a conceptual assessment matrix, not an empirical finding. Use Decker, The Sanctions–Adaptation–Targeting Doctrine (2026), §I.B, Table 2, as the controlling specification. Record version, language, and adaptations; exact visual replication requires the original layout. 2. Set the system boundary. Identify the facility, process, product, or capability; the restriction; the starting event; and the assessment horizon. Specify output, quality, operating conditions, and sustainment duration before analysis. Use the same definitions across national settings. 3. Construct six rows: procurement availability and provenance; functional adequacy and compatibility; integration and qualification time; sustainable throughput and quality; lifecycle and maintenance requirements; external dependence and enforcement exposure. Use four columns: dimension, assessment question, illustrative evidence, and inference safeguard. 4. Map evidence to function. Distinguish orders, dispatch, receipt, installation, qualification, and replenishment. Separate domestic manufacture, foreign manufacture, re-export, inventories, and recovered components. Require demonstrated integration readiness rather than assuming delivery restores capability (GAO, Technology Readiness Assessment Guide, GAO-20-48G, 2020). 5. Model production and time. Identify process dependencies, parallel activities, resource constraints, and bottlenecks; do not simply add task durations (GAO, Schedule Assessment Guide, GAO-16-89G, 2015). Separate design readiness from demonstrated producibility (GAO, GAO-02-701, 2002). Assess stable output against specifications and disclose sampling assumptions (NIST/SEMATECH, e-Handbook, §6.1.6). 6. Test continuity and exposure. Record failures, downtime, repairs, spares, and observed versus projected reliability (NIST/SEMATECH, e-Handbook, ch. 8). Map suppliers, jurisdictions, payments, and inputs; changed suppliers do not prove independence (U.S. Treasury, 2021 Sanctions Review, p. 2). 7. Audit and export. Preserve missing evidence as unknown. Separate observed timing from restriction-attributable delay, which requires a credible counterfactual. Report unmet thresholds without inferring permanent denial. Keep dimensions separate unless aggregation is justified. Check every cell against Table 2, retain citations and authorship, and export a figure with a versioned source matrix. Record translations, edits, and uncertainty for review.