Deadline-core decomposition for flexible job shops: code, schedules and validation scripts
Description
Code, result files and validation scripts for an exact deadline-core decomposition that maximizes the number of on-time orders in flexible job shops with sequence-dependent family setups and intercell transport. The package contains the solver, the parsers for two public datasets (Deliktaş et al. 2024 flexible job-shop cell benchmark; Tarigan 2025 flexible-packaging data), all reported schedules and bounds, separate feasibility validators and the figure scripts. Source datasets are not redistributed; download links and run instructions are given in README.md.
Files
Steps to reproduce
Download the source datasets: the flexible job-shop cell benchmark (https://doi.org/10.17632/rtzby7pv7m.1) and the flexible-packaging data (https://doi.org/10.17632/h66hb89k6z.1). Unpack this package. Place the benchmark instance files under new_study/fjcs/Instances/ (keeping the original subfolders) and the six packaging workbooks under new_study/packaging/. Install Python 3.12 and the packages in requirements.txt (pip install -r requirements.txt; OR-Tools 9.15.6755). From the package root, run the commands listed in README.md: deadline_core_solver.py for benchmark instances 1–43 (decomposition and monolithic CP models), then packaging_replay.py, production_energy_bound.py and packaging_exact.py for the packaging case. Run verify_production_pilot.py and validate_exact_schedules.py to check all schedules against the source data, and make_final_figures.py to regenerate the figures. Compare the output with the supplied result files and the expected values in README.md. Notes: the solver appends to its output files, so rename the supplied result files before a fresh run. CP-SAT with eight workers is not deterministic; wall-clock times and the time-limited result for instance 43 may differ slightly between runs, while proven optimal values do not.
Institutions
- Istanbul Health and Technology UniversityIstanbul, Istanbul