Minimizing Makespan and Tardy Jobs in Parallel Machine Scheduling with Sequence-Dependent Setup Times: A Simulated Annealing Approach for the Weaving Industry

Published: 2 January 2026| Version 3 | DOI: 10.17632/35d6hhpczp.3
Contributors:
,
,
,

Description

GAMS and MATLAB Data for Minimizing Makespan and Tardy Jobs in Parallel Machine Scheduling with Sequence-Dependent Setup Times Study

Files

Institutions

  • Cukurova Universitesi

Categories

Heuristics, Parallel Machine Scheduling, Weaving

Licence