Minimizing Makespan and Tardy Jobs in Parallel Machine Scheduling with Sequence-Dependent Setup Times: A Simulated Annealing Approach for the Weaving Industry
Published: 2 January 2026| Version 3 | DOI: 10.17632/35d6hhpczp.3
Contributors:
, , , Description
GAMS and MATLAB Data for Minimizing Makespan and Tardy Jobs in Parallel Machine Scheduling with Sequence-Dependent Setup Times Study
Files
Institutions
- Cukurova Universitesi
Categories
Heuristics, Parallel Machine Scheduling, Weaving