Data for: Permutation flowshop scheduling with periodic maintenance and makespan objective
Published: 19 March 2020| Version 1 | DOI: 10.17632/6dhnv8t8w8.1
Contributors:
Paz Perez-Gonzalez, , Description
Examples with small size instances to obtain the initial sequence of heuristics H1, H2 and H3 presented in the paper. Detailed results from the statistical analysis carried out (cases: constant T and variable T)
Files
Categories
Heuristics, Flowshop Scheduling