Data (raw data) for: Risk Assessment and Management via Multi-source Information Fusion for Undersea Tunnel Construction

Published: 4 January 2020| Version 1 | DOI: 10.17632/fw8wy6kdff.1
Contributors:
HONG ZHOU, Hubo Cai, Qiang Shen, Liu Yang, Yinghui Zhao

Description

These are raw data. We selected the actual quality data of the jobsite from May 2017 to January 2018 to prove the actual basis of the study.Line 75 (marked yellow line) is the shield tunneling parameters of ring 343, the ring where the cutter disc accident occurred.This is also the quality data used in this paper. The rest of the index data is obtained from geological investigation report, material records, work records and personnel testing, which are a lot of files and can be upload later if necessary.

Files

Categories

Mathematics, Civil Engineering, Construction Management

Licence