CP Model for the Extended Multi-Manned Assembly Line Balancing Problem with Assignment Restrictions (MALBP-AR)
Published: 13 May 2024| Version 1 | DOI: 10.17632/gcvw3jmp2y.1
Contributor:
Moacyr Carlos Possan JuniorDescription
Paper's dataset with benchmark-based instances developed for an exploratory study of an Extended MALBP-AR problem. Several restrictions found in practice for transformed resources are considered here.
Files
Institutions
Universidade Tecnologica Federal do Parana
Categories
Combinatorial Optimization, Flowshop Scheduling, Resource Allocation, Constraint Programming, Assembly Line Balancing
Funding
National Council for Scientific and Technological Development
313560/2023-4
Australian Research Council Industrial Transformation Training Centre in Optimisation Technologies, Integrated Methodologies, and Applications (OPTIMA)
IC200100009