CP Model for the Extended Multi-Manned Assembly Line Balancing Problem with Assignment Restrictions (MALBP-AR)
Published: 13 May 2024| Version 1 | DOI: 10.17632/gcvw3jmp2y.1
Contributor:
Moacyr Carlos Possan JuniorDescription
Paper's dataset with benchmark-based instances developed for an exploratory study of an Extended MALBP-AR problem. Several restrictions found in practice for transformed resources are considered here.
Files
Institutions
- Universidade Tecnologica Federal do Parana
Categories
Combinatorial Optimization, Flowshop Scheduling, Resource Allocation, Constraint Programming, Assembly Line Balancing
Funders
- Australian Research Council Industrial Transformation Training Centre in Optimisation Technologies, Integrated Methodologies, and Applications (OPTIMA)Grant ID: IC200100009