CP Model for the Extended Multi-Manned Assembly Line Balancing Problem with Assignment Restrictions (MALBP-AR)

Published: 13 May 2024| Version 1 | DOI: 10.17632/gcvw3jmp2y.1
Contributor:
Moacyr Carlos Possan Junior

Description

Paper's dataset with benchmark-based instances developed for an exploratory study of an Extended MALBP-AR problem. Several restrictions found in practice for transformed resources are considered here.

Files

Institutions

Universidade Tecnologica Federal do Parana

Categories

Combinatorial Optimization, Flowshop Scheduling, Resource Allocation, Constraint Programming, Assembly Line Balancing

Funding

Conselho Nacional de Desenvolvimento Científico e Tecnológico

313560/2023-4

Australian Research Council Industrial Transformation Training Centre in Optimisation Technologies, Integrated Methodologies, and Applications (OPTIMA)

IC200100009

Licence