Embankment Test Dam of Älvkarleby - Injection grouting

Published: 14 April 2025| Version 1 | DOI: 10.17632/gpv9dyrz5y.1
Contributors:
Johan Lagerlund, Niklas Hansson

Description

The data originate from a project with a full-scale rock fill embankment dam constructed at the Vattenfall Research and Development facilities in Älvkarleby, Sweden. Injection grouting tests were made in November 2022 in the embankment test dam of Älvkarleby. 6 holes were drilled and injected. Three different grouts were used. Different injection pressures were used. This data set contains the location and depth as well as the time and date for the injection grouting tests. Design of the dam and intentionally installed defects are presented in Lagerlund et al. (2022), "Embankment Test Dam of Älvkarleby - Description of installed defects and their position.", Mendeley Data, V3, [DOI:10.17632/k7zrrbxxnb.3]. Data from seepage and turbidity measurements during dam operations are available in Hansson et al. (2024), “Embankment Test Dam of Älvkarleby – Data from seepage and turbidity measurements.”, Mendeley Data, V3, [DOI:10.17632/zhfx2g7s7b.3]

Files

Institutions

  • Vattenfall Research and Development AB

Categories

Injection, Embankment, Grout, Dam

Licence