Result of daily test for water treatment plant Kirkuk, Iraq for March 2011

Published: 4 September 2024| Version 1 | DOI: 10.17632/gs4gcwpjbr.1
Contributors:
Faisel G Saber,

Description

The information from the laboratory of the Kirkuk unified water treatment plant used in this dataset is for March 2011 only. This information is in the form of tests for raw water, water output from the sedimentation basins, and water output from filtration. In addition, the amount of ALUM added to the water per day, the amount of chlorine used per hour, the water temperature, and the flows for each sample are also recorded. The amount of alum used per day was determined by a jar test, and the amount of chlorine used per hour depends on the amount of water processed for consumers per hour. We are interested in 5 parameters of raw water for our study. Turbidity (TU), PH, Total Suspended Solid (TSS), Total Dissolved Solid (TDS), and Electrical Conductivity (EC).

Files

Steps to reproduce

Monthly, at a rate of 3 records per day

Institutions

Sumerian Scriptum Synthesis Publisher, Northern Technical University, Cankaya Universitesi

Categories

Meta Dataset

Licence