Data (measured value) for: Risk Assessment and Management via Multi-source Information Fusion for Undersea Tunnel Construction

Published: 4 January 2020| Version 1 | DOI: 10.17632/jwbkt4kmnz.1
Contributors:
HONG ZHOU, Hubo Cai, Qiang Shen, Liu Yang, Yinghui Zhao

Description

Here is the 4M1E system data obtained at the site, which is used as the measured value to support the calculation results, in the Discussion section, line 591-615 of this paper. Data for 8 days from October to November 2018 were randomly selected, and the risk level was calculated according to these data. The results were consistent with the actual situation, so as to prove the validity and applicability of the undersea tunnel construction risk evaluation system.

Files

Categories

Architectural Engineering, Mathematics-Number