PERBANDINGAN METODE PELAKSANAAN DINDING PENAHAN TANAH MENGGUNAKAN SECANT PILE DAN SHEET PILE

Published: 21 November 2018| Version 1 | DOI: 10.17632/r7d85yjd6f.1
Contributor:
Jojok.Widodo Soetjipto

Description

This data consists of the cost of the construction method which employed at project

Files

Steps to reproduce

This data must be compared between 2 difference method.

Categories

Construction Cost

Licence