supplementary data of process models and process simulations
Published: 27 May 2019| Version 1 | DOI: 10.17632/vcfdg5py82.1
Contributors:
, , , Description
The file contains the detailed information of material flow process diagrams modeled for the BIM-RFID lean process, the traditional process and the lean process without BIM-RFID. The descriptions of each process step and information exchange between process steps are also provided following the process diagrams. In order to compare the three processes, discrete event simulation was conducted for each process respectively based on the estimated duration of the modeled process steps. The data of estimated durations are provided in this file.
Files
Institutions
Eidgenossische Technische Hochschule Zurich Institut fur Bau- und Infrastrukturmanagement
Categories
Construction Management