“Performance evaluation of prefabricated building projects through the three-stage super-efficient EBM model ” Project raw data and project performance measurement results data
Published: 7 October 2024| Version 1 | DOI: 10.17632/vrdxkjkm23.1
Contributor:
zufeng shangDescription
The dataset contains the original data of 31 prefabricated building projects and data on influencing factors. The project performance data and the review factors of the influencing factors can be calculated using the methods mentioned in the article.
Files
Steps to reproduce
The project data in this dataset were obtained from a survey of 31 completed prefabricated construction projects by three companies conducted by our team. Based on this data, a three-stage super-efficient EBM model was constructed using MAXDEA9.0 to measure project performance results. Stata 17 was used to build a Tobit model to calculate the regression coefficients of various influencing factors and the p value.
Institutions
Harbin Institute of Technology
Categories
Construction Project Management
Funding
National Natural Science Foundation of China