“Evaluation of Prefabricated Building Project Performance: A Novel Three-Stage Super-efficient Network Epsilon-based Measurement Model” Project raw data and project performance measurement results data

Published: 18 May 2026| Version 2 | DOI: 10.17632/vrdxkjkm23.2
Contributor:
zufeng shang

Description

The dataset contains the original data of 31 prefabricated building projects and data on influencing factors. The project performance data and the review factors of the influencing factors can be calculated using the methods mentioned in the article. Note: A comparison of the two versions reveals alterations in the values, attributable to the redefinition of installation tolerance. Consequently, the original data of the Tobit model has been updated. The remaining data has been left unaltered.

Files

Steps to reproduce

The project data in this dataset were obtained from a survey of 31 completed prefabricated construction projects by three companies conducted by our team. Based on this data, a three-stage super-efficient EBM model was constructed using MAXDEA9.0 to measure project performance results. Stata 17 was used to build a Tobit model to calculate the regression coefficients of various influencing factors and the p value.

Institutions

Categories

Construction Project Management

Funders

Licence