Dimensions of Quality framework for evaluating integrated management system: a case study in the construction industry
Published: 19 March 2024| Version 2 | DOI: 10.17632/wnyh5mz8md.2
Contributor:
Mariana BravoDescription
NOT APPLICABLE
Files not available for this dataset
This contains only metadata
Steps to reproduce
The deployment workflow is based on the PDCA (Plan-Do-Check-Act) methodology, which is available in ISO 9001 (ABNT, 2015a) and the Habitat Brazilian Quality and Productivity Program (PBQP-H, 2017)
Institutions
Universidade Estadual de Campinas Faculdade de Engenharia Civil Arquitetura e Urbanismo
Categories
Management, Management Quality
Funding
Coordenação de Aperfeiçoamento de Pessoal de Nível Superior