Grimm OPC data for isolating pollen signals

Published: 25 March 2024| Version 1 | DOI: 10.17632/zkbp3jt32f.1
Contributors:
, Sumit Khandelwal, A.B. Gupta

Description

Grimm OPC data from 01 January 2023 to 30 April 2023

Files

Steps to reproduce

Using Grimm OPC EDM 264 Pro instrument.

Institutions

  • Malaviya National Institute of Technology

Categories

Environmental Allergy

Licence