Filter Results
101 results
- Data for: Production of biochar from oil palm frond by steam pyrolysis for removal of residual contaminants in palm oil mill effluent final dischargeThe raw data provide analysis on textural and chemical properties of the biochar produced
- Data for: Do Ecolabels Cheapen Wines?Lim and Reed 2019
- Data for: Participatory planning of the future of waste management in small island developing states to deliver on the Sustainable Development GoalsThis Excel model encodes the analytical capability required to undertake an application of the adapted National Infrastructure Systems Modelling (NISMOD) capability, which has been developed by the Infrastructure Transitions Research Consortium (ITRC) - a UK based research consortium, led by the University of Oxford. Through a partnership between the United Nations Office for Project Service (UNOPS) and the ITRC, an initial national infrastructure assessment for Curaçao, known as Evidence-Based Infrastrastucture Assessment, has been performed. The focus of this model lies on one priority sector for the SIDS Curaçao: 'Waste Management'.
- Data for: Life Cycle Assessment of Greenhouse Gas Emissions from Asphalt Pavement Maintenance“Result data” includes the final calculation results by life cycle assessment. "Figure data" includes the source data of all figures.
- Data for: ENVIRONMENTAL LIFE CYCLE ASSESSMENT OF YOGHURT SUPPLY TO CONSUMER IN TURKEYLife Cycle Assessment of Yoghurt Production in Turkey - 9 separate models (CCaLC2 files) - The results file (in MS Excel format)
- Data for: Do pro-environmental factors lead to purchase intention of hybrid vehicles? The spill-over effects of environmental knowledgePurchase intention of hybrid vehicles among Malaysian consumers.
- Data for: Greenhouse Gas Emissions and Production Cost Footprints in Australian Gold MinesData for Australian Gold Mines for the period 1 January 2014 to 30 June 2018. The data includes: - Gold or gold equivalent produced (oz), gold head grade (g/t), number of ore tonnes processed; - Greenhouse gas emissions, Scope 1, Scope 2 and/or total Scope 1 and Scope 2 emissions (kg CO2-e); - Calculation of GHG emissions intensities per tonne of ore processed, per troy ounce and per kilogram of gold produced; - Energy consumption in gigajoules (GJ); - Calculation of energy consumption intensities per tonne of ore processed, per troy ounce and per kilogram of gold produced; - Nominal reported All-in Sustaining Costs (AISC) in Australian and US dollars per ounce; - Australian CPI Data; and - Calculated real AISC in Australian and US dollars per ounce as of 30 June 2018.
- Data for: Life Cycle Inventory of techniques for stone quarrying, cutting and finishing: contribution to fill data gaps.Life Cycle Inventory datasets on the most common techniques of stone quarrying/cutting/finishing.
- Data for: Local conflicts and national consensus: The strange case of circular economy in SwedenList of press material analysed in the study.
- Data for: Green Closed-Loop Supply Chain Network Design under UncertaintyRaw Date of Input Parameters
1